Sustainable bitcoin at industrial scale.
Direct access to zero-carbon, low-cost power.
Opportunity to develop up to 960 MW bitcoin mining facilities at Susquehanna nuclear site.
Campus construction commenced in July 2021.
Clean and cost-effective source of power to the mining operation at $20/MWHr for the first 100 MW.
Necessary infrastructure for mining operations provided (transmission lines, fiber connectivity, etc.).
Land provided within digital campus via a long-term lease.
960 MW potential at campus and 2.2 GW pipeline across Talen Energy generation fleet.
Campus construction commenced in July 2021.
IT load fed by 2.5 GW of nuclear generation with strong physical site security attributes.
Guaranteed long-term power pricing paired with competitive lease rates.
Master plan completed for multiple building sites; design flexibility with build-to-suit option.
24x7 nuclear power with the option to supplement 400+ MW solar.